Assessment Year | 1998 |
---|---|
Principal Product | water pumps |
NAICS |
n/a
|
SIC | 3561: Pumps and Pumping Equipment |
Sales Range | $5 M to 10M |
# of Employees | 59 |
Plant Area |
300,000
ft2
|
Annual Production | 10,850
pieces
|
Production Hrs. Annual | 2,125
hrs
|
Location (State) | Nebraska |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $20,576 | 970,985 |
kWh
|
$0.021 |
Electricity Demand | $32,402 | 3,458 |
kW-mo/yr
|
$9.37 |
Natural Gas | $69,938 | 15,730 |
MMBtu
|
$4.45 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $32,070 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,820 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.8121: Apply for tax-free status for energy purchases | $6,740 | $200 | - | - | - | - | - | $6,740 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,400 | $4,710 |
$710
33,411
kWh
|
$1,770
-
kW-mo/yr
|
- | - | $920 | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,670 | $900 |
$480
22,567
kWh
|
$1,190
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $350 | $1,000 | - | - |
$350
-
MMBtu
|
- | - | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $310 | $400 |
$90
4,103
kWh
|
$220
-
kW-mo/yr
|
- | - | - | - | |
06 | 3.2124: Convert to air assisted / airless paint guns | $14,350 | $8,630 | - | - | - | - | - | $14,350 | |
07 | 3.5146: Utilize a central coolant system for cleaning and reuse of metal working fluid | $3,900 | $11,720 | - | - | - |
$670
-
gal
|
- | $3,230 | |
08 | 4.513: Re-arrange equipment layout to reduce labor costs | $1,350 | $2,310 | - | - | - | - | $1,350 | - | |
TOTAL RECOMMENDED | $32,070 | $29,870 |
$1,280
60,081
kWh
|
$3,180
-
kW-mo/yr
|
$350
-
MMBtu
|
$670
-
gal
|
$2,270 | $24,320 | ||
TOTAL IMPLEMENTED | $13,820 | $9,520 |
$1,280
60,081
kWh
|
$3,180
-
kW-mo/yr
|
$350
-
MMBtu
|
- | $2,270 | $6,740 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs