Assessment Year | 2006 |
---|---|
Principal Product | CNC Machining of Various Materials |
NAICS | 333514: Special Die and Tool, Die Set, Jig, and Fixture Manufacturing |
SIC | 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds |
Sales Range | $5 M to 10M |
# of Employees | 100 |
Plant Area |
28,000
ft2
|
Annual Production | 1,000,000
pieces
|
Production Hrs. Annual | 7,344
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $64,744 | 3,113,440 |
kWh
|
$0.021 |
Electricity Demand | $57,946 | 369 |
kW-mo/yr
|
$157.04 |
Natural Gas | $16,797 | 1,564 |
MMBtu
|
$10.74 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $143,176 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $110,444 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 4.111: Add equipment/ operators to reduce production bottleneck | $91,800 | $6,000 | - | - | - | - | $91,800 | |
02 | 3.5311: Recover and reuse waste material | $28,944 | $2,000 | - | - | - |
$28,944
-
gal
|
- | |
03 | 2.7233: Use properly designed and sized hvac equipment | $8,313 | - | - | - |
$8,313
-
MMBtu
|
- | - | |
04 | 2.7226: Use computer programs to optimize hvac performance | $7,084 | - | - | - |
$7,084
-
MMBtu
|
- | - | |
05 | 2.7226: Use computer programs to optimize hvac performance | $1,819 | - |
$1,090
40,120
kWh
|
$729
-
kW-mo/yr
|
- | - | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,479 | $1,700 | - |
$1,479
-
kW-mo/yr
|
- | - | - | |
07 | 2.2437: Recover waste heat from equipment | $1,348 | $500 |
$357
13,319
kWh
|
$859
-
kW-mo/yr
|
$132
-
MMBtu
|
- | - | |
08 | 2.4224: Upgrade controls on compressors | $859 | - |
$859
31,824
kWh
|
- | - | - | - | |
09 | 2.4237: Substitute compressed air cooling with water or air cooling | $658 | $500 | - |
$658
-
kW-mo/yr
|
- | - | - | |
10 | 2.4231: Reduce the pressure of compressed air to the minimum required | $401 | - |
$222
8,225
kWh
|
$179
-
kW-mo/yr
|
- | - | - | |
11 | 2.7442: Keep doors and windows shut when not on use | $382 | $459 |
$28
477
kWh
|
- |
$354
-
MMBtu
|
- | - | |
12 | 2.2437: Recover waste heat from equipment | $89 | $400 | - | - |
$89
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $143,176 | $11,559 |
$2,556
93,965
kWh
|
$3,904
-
kW-mo/yr
|
$15,972
-
MMBtu
|
$28,944
-
gal
|
$91,800 | ||
TOTAL IMPLEMENTED | $110,444 | $7,459 |
$1,244
45,620
kWh
|
$1,517
-
kW-mo/yr
|
$15,883
-
MMBtu
|
- | $91,800 | ||