ITAC Assessment: UL2616
ITAC logo
ITAC Assessment: UL2616
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Wood Veneer
NAICS 321211: Hardwood Veneer and Plywood Manufacturing
SIC 2435: Hardwood Veneer and Plywood
Sales Range $10
M
to 50
M
# of Employees 72
Plant Area 88,000
ft2
Annual Production 1,100,000
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $87,198 654,389
kWh
Electricity Fees $3,294 -
Natural Gas $41,085 3,828
MMBtu
TOTAL YEARLY COSTS $131,577
RECOMMENDED SAVINGS* $42,174 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7444: Close holes and openings in building such as broken windows $3,302 $870 $3,302
24,824
kWh
-
02 2.4325: Upgrade conveyors $730 $1,050 $730
5,424
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,932 $3,420 $4,932
36,656
kWh
-
04 2.2136: Install / repair insulation on steam lines $30 $80 - $30
-
MMBtu
05 2.9114: Use solar heat to make electricty $29,169 $222,999 $29,169
216,738
kWh
-
06 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $1,404 $720 $1,404
10,435
kWh
-
07 2.2423: Install waste heat boiler to produce steam $2,606 $11,000 - $2,606
-
MMBtu
TOTAL RECOMMENDED $42,174 $240,139 $39,537
294,077
kWh
$2,636
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs