ITAC Assessment: CW0125
ITAC logo
ITAC Assessment: CW0125
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Rigid PVC cubes and pellets
NAICS 325991: Custom Compounding of Purchased Resins
SIC 3087: Custom Compounding of Purchased Plastics Resins
Sales Range $100
M
to 500
M
# of Employees 65
Plant Area 300,000
ft2
Annual Production 100,000,000
lb
Production Hrs. Annual 8,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,401,668 20,246,711
kWh
Electricity Demand $1,221,173 125,142
kW-mo/yr
Natural Gas $330,596 57,248
MMBtu
Waste Disposal Costs
Water Usage $260,759 24,586
Tgal
TOTAL YEARLY COSTS $3,214,196
RECOMMENDED SAVINGS* $245,171 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,655 $2,019 $6,655
96,445
kWh
- - -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $17,007 $17,900 $17,007
246,478
kWh
- - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $37,427 $1,156 $37,427
542,426
kWh
- - -
04 2.4314: Use synthetic lubricant $18,816 $9,059 $18,816
272,699
kWh
- - -
05 2.1223: Install smaller boiler (increase high fire duty cycle) $23,398 $56,000 - - $23,398
-
MMBtu
-
06 2.2614: Use cooling tower or economizer to replace chiller cooling $70,112 $8,000 $(-1,478.0)
(-21,420)
kWh
$(-409.9)
-
kW-mo/yr
- $72,000
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,449 $25,995 $8,449
122,450
kWh
- - -
08 2.9114: Use solar heat to make electricty $63,307 $41,871 $63,307
917,489
kWh
- - -
TOTAL RECOMMENDED $245,171 $162,000 $150,183
2,176,567
kWh
$(-409.9)
-
kW-mo/yr
$23,398
-
MMBtu
$72,000
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs