ITAC Assessment: UD0545
ITAC logo
ITAC Assessment: UD0545
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Robotic systems for premium casting industry
NAICS
n/a
SIC 3569: General Industrial Machinery and Equipment, Not Elsewhere
Sales Range $5
M
to 10
M
# of Employees 35
Plant Area 34,000
ft2
Annual Production 30
lb
Production Hrs. Annual 3,150
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $9,859 379,250
kWh
Electricity Demand $19,417 1,380
kW-mo/yr
Natural Gas $3,450 714
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,159 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,984

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Primary Product Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $8,114 $15,000 $428
16,413
kWh
$8,442
-
kW-mo/yr
$(-506.0)
-
MMBtu
$(-250.0) - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,984 $10,116 $1,447
55,686
kWh
$3,537
-
kW-mo/yr
- - - - -
03 3.1191: Change procedures / equipment / operating conditions $1,753 $500 - - - $225 - $360 $1,168
04 2.8112: Combine utility meters $308 - - - - - $308 - -
TOTAL RECOMMENDED $15,159 $25,616 $1,875
72,099
kWh
$11,979
-
kW-mo/yr
$(-506.0)
-
MMBtu
$(-25.0) $308 $360 $1,168
TOTAL IMPLEMENTED $4,984 $10,116 $1,447
55,686
kWh
$3,537
-
kW-mo/yr
- - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs