| Assessment Year | 1999 |
|---|---|
| Principal Product | Heat Transfer Products |
| NAICS |
n/a
|
| SIC | 3443: Fabricated Plate Work (Boiler Shops) |
| Sales Range | $10 M to 50M |
| # of Employees | 300 |
| Plant Area |
128,150
ft2
|
| Annual Production | 410,000
pieces
|
| Production Hrs. Annual | 4,576
hrs
|
| Location (State) | South Dakota |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $276,835 | 7,956,624 |
kWh
|
$0.035 |
| Electricity Demand | $164,106 | 18,240 |
kW-mo/yr
|
$9.00 |
| Electricity Fees | $17,638 | - |
|
- |
| Natural Gas | $225,175 | 76,453 |
MMBtu
|
$2.95 |
| LPG | $11,700 | 2,484 |
MMBtu
|
$4.71 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $65,611 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $32,060 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $800 | $135 |
$476
13,482
kWh
|
$324
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.2437: Recover waste heat from equipment | $4,177 | $7,500 | - | - |
$4,177
-
MMBtu
|
- | - | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $2,280 | $2,400 |
$1,362
38,980
kWh
|
$918
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.2511: Insulate bare equipment | $16,788 | $3,567 |
$7,002
200,176
kWh
|
- |
$9,786
-
MMBtu
|
- | - | |
| 05 | 2.6218: Turn off equipment when not in use | $16,588 | $20 |
$4,930
140,973
kWh
|
- |
$11,658
-
MMBtu
|
- | - | |
| 06 | 2.4322: Use or replace with energy efficient substitutes | $16,043 | $640 |
$9,563
273,447
kWh
|
$6,480
-
kW-mo/yr
|
- | - | - | |
| 07 | 3.5316: Contract a wood pallet recycling company | $8,760 | $90 | - | - | - |
$8,760
-
lb
|
- | |
| 08 | 4.611: Begin a practice of predictive / preventative maintenance | $175 | - | - | - | - | - | $175 | |
| TOTAL RECOMMENDED | $65,611 | $14,352 |
$23,333
667,058
kWh
|
$7,722
-
kW-mo/yr
|
$25,621
-
MMBtu
|
$8,760
-
lb
|
$175 | ||
| TOTAL IMPLEMENTED | $32,060 | $10,765 |
$11,401
325,909
kWh
|
$7,722
-
kW-mo/yr
|
$4,177
-
MMBtu
|
$8,760
-
lb
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs