Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Oilfiled Tools
NAICS
n/a
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $50
M
to 100
M
# of Employees 240
Plant Area 45,000
ft2
Annual Production 6,000
pieces
Production Hrs. Annual 7,280
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $97,849 2,661,023
kWh
Electricity Demand $43,336 5,896
kW-mo/yr
Electricity Fees $6,876 -
Natural Gas $163,011 31,300
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,133 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,933

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings
01 2.7111: Reduce illumination to minimum necessary levels $7,992 $825 $6,002
165,058
kWh
$1,683
-
kW-mo/yr
$307 - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,007 - $2,891
79,503
kWh
- $116 - -
03 2.7111: Reduce illumination to minimum necessary levels $2,939 $3,429 $2,209
60,761
kWh
$617
-
kW-mo/yr
$113 - -
04 2.7135: Install occupancy sensors $960 $428 $673
18,521
kWh
$250
-
kW-mo/yr
$37 - -
05 3.5316: Contract a wood pallet recycling company $6,240 - - - - $6,240
-
lb
-
06 4.611: Begin a practice of predictive / preventative maintenance $8,995 $12,400 - - - - $8,995
TOTAL RECOMMENDED $30,133 $17,082 $11,775
323,843
kWh
$2,550
-
kW-mo/yr
$573 $6,240
-
lb
$8,995
TOTAL IMPLEMENTED $22,933 $16,654 $11,102
305,322
kWh
$2,300
-
kW-mo/yr
$536 - $8,995
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs