ITAC Assessment: MA0143
ITAC logo
ITAC Assessment: MA0143
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product SPECIALTY VALVES
NAICS
n/a
SIC 3491: Industrial Valves
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,582
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $120,490 1,679,660
kWh
Natural Gas $13,048 2,012
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,342 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,804

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $2,865 $286 $1,703
23,740
kWh
$1,162
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,156 $505 $2,156
30,188
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $252 $75 $252
3,517
kWh
-
04 2.7244: Revise smoke cleanup from operations $1,266 $390 $1,052
14,654
kWh
$214
-
MMBtu
05 2.7244: Revise smoke cleanup from operations $4,545 $980 $1,599
22,274
kWh
$2,946
-
MMBtu
06 2.7261: Install timers and/or thermostats $2,142 $3,000 - $2,142
-
MMBtu
07 2.7226: Use computer programs to optimize hvac performance $19,116 $25,000 $19,116
266,413
kWh
-
TOTAL RECOMMENDED $32,342 $30,236 $25,878
360,786
kWh
$6,464
-
MMBtu
TOTAL IMPLEMENTED $9,804 $4,341 $3,554
49,531
kWh
$6,250
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs