Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,605

matching recommendations
$
$
ARC Combustion systems
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UU0307 #03 Y:2026 Replace boiler $1,650 $37,000
DL0273 #03 Y:2026 Replace boiler $6,936 $20,000
MU0091 #02 Y:2026 Replace fossil fuel equipment with electrical equipment $27,468 -
UU0305 #02 Y:2026 Replace boiler $9,930 $39,000
UL2607 #07 Y:2026 Repair faulty insulation in furnaces, boilers, etc $12,834 $2,331
MZ0398 #05 Y:2026 Analyze flue gas for proper air/fuel ratio $6,340 $1,000
MZ1023 #09 Y:2026 Use steam sparging or injections in place of indirect heating $163,794 $190,000
AS0615 #03 Y:2026 Replace fossil fuel equipment with electrical equipment $10,695 $218,314
UF0649 #02 Y:2026 Direct warmest air to combustion intake $28,912 $11,000
UC2606 #07 Y:2026 Adjust burners for efficient operation $676 $800
UF0648 #04 Y:2026 Direct warmest air to combustion intake $3,734 $11,000
SD0690 #13 Y:2026 Replace obsolete burners with more efficient ones $6,945 $8,300
MZ0395 #03 Y:2026 Analyze flue gas for proper air/fuel ratio $2,954 $1,000
NT0063 #01 Y:2026 Replace fossil fuel equipment with electrical equipment $170,396 $896,000
CI0079 #04 Y:2026 Re-size charging openings or add a movable door on equipment $40,621 $150,000
CI0079 #01 Y:2026 Replace fossil fuel equipment with electrical equipment $452,150 $420,000
OK1168 #02 Y:2026 Improve combustion control capability $21,754 $22,000
CI0078 #03 Y:2026 Replace boiler $13,617 $40,000
MUCM36 #03 Y:2026 Replace boiler $5,317 $29,813
UU0301 #07 Y:2026 Use heat from boiler blowdown to preheat boiler feed water $4,360 $9,520