| Assessment Year | 2026 |
|---|---|
| Principal Product | Talc |
| NAICS | 327992: Ground or Treated Mineral and Earth Manufacturing |
| SIC | 3295: Minerals and Earths, Ground or Otherwise Treated |
| Sales Range | $50 M to 100M |
| # of Employees | 54 |
| Plant Area |
724,000
ft2
|
| Annual Production | 120,000
ton
|
| Production Hrs. Annual | 8,400
hrs
|
| Location (State) | Montana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $957,373 | 13,319,286 |
kWh
|
$0.072 |
| Natural Gas | $407,321 | 86,575 |
MMBtu
|
$4.70 |
| LPG | $21,497 | 1,104 |
MMBtu
|
$19.48 |
| Fuel Oil #1 | $45,282 | 1,851 |
MMBtu
|
$24.46 |
| TOTAL YEARLY COSTS | $1,431,474 | |||
| RECOMMENDED SAVINGS* | $218,540 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | LPG Savings | Personnel Changes Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 4.131: Modify process to reduce material use/cost | $7,200 | $4,635 | - | - | - | - | $7,200 | |
| 02 | 2.2511: Insulate bare equipment | $11,840 | $7,940 | - |
$11,840
-
MMBtu
|
- | - | - | |
| 03 | 2.2443: Re-use or recycle hot or cold process exhaust air | $12,500 | $41,270 | - |
$12,500
-
MMBtu
|
- | - | - | |
| 04 | 4.661: Level zero – install control systems for existing equipment | $157,000 | $650,000 |
$7,000
91,400
kWh
|
- | - | - | $150,000 | |
| 05 | 2.1321: Replace fossil fuel equipment with electrical equipment | $30,000 | $139,500 |
$(-2,820.0)
(-39,220)
kWh
|
- |
$21,500
-
MMBtu
|
$11,320 | - | |
| TOTAL RECOMMENDED | $218,540 | $843,345 |
$4,180
52,180
kWh
|
$24,340
-
MMBtu
|
$21,500
-
MMBtu
|
$11,320 | $157,200 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs