ITAC Assessment: MS0256
ITAC logo
ITAC Assessment: MS0256
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Sodium Chlorate
NAICS 325180: Other Basic Inorganic Chemical Manufacturing
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 109
Plant Area 1,000,000
ft2
Annual Production 287,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,500,000 100,000,000
kWh
Electricity Fees $474,233 -
Natural Gas $968,768 152,924
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $813,791 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,218

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.9131: Install hydrogen fuel cell $711,668 $7,500,000 n/a $701,150
17,528,760
kWh
$10,518 -
02 2.2414: Use waste heat from hot flue gases to preheat $53,846 $54,000 n/a - - $53,846
-
MMBtu
03 2.1233: Analyze flue gas for proper air/fuel ratio $34,367 $1,000 - - $34,367
-
MMBtu
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $6,725 $3,794 $6,625
220,848
kWh
$100 -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,059 $11,743 $3,999
133,292
kWh
$60 -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,126 $422 $3,082
102,728
kWh
$44 -
TOTAL RECOMMENDED $813,791 $7,570,959 $714,856
17,985,628
kWh
$10,722 $88,213
-
MMBtu
TOTAL IMPLEMENTED $44,218 $5,216 $9,707
323,576
kWh
$144 $34,367
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs