ITAC Assessment: IA0031
ITAC logo
ITAC Assessment: IA0031
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product CORRUGATED PAPER CONTS.
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area
n/a
Annual Production 700,000
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $289,023 5,217,468
kWh
Natural Gas $187,644 56,022
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $57,857 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,770

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $22,249 $1,500 - $22,249
-
MMBtu
-
02 2.2437: Recover waste heat from equipment $8,758 $1,247 - $8,758
-
MMBtu
-
03 2.1213: Direct warmest air to combustion intake $1,054 $250 - $1,054
-
MMBtu
-
04 2.6232: Install set-back timers $8,958 $19,000 $8,958
162,075
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $6,307 $322 $6,972
126,026
kWh
- $(-665.0)
06 2.6232: Install set-back timers $5,731 $3,033 $5,731
103,751
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $150 $200 $150
2,638
kWh
- -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,333 $100 $4,333
78,253
kWh
- -
09 2.2511: Insulate bare equipment $317 $136 $280
4,982
kWh
$37
-
MMBtu
-
TOTAL RECOMMENDED $57,857 $25,788 $26,424
477,725
kWh
$32,098
-
MMBtu
$(-665.0)
TOTAL IMPLEMENTED $38,770 $5,155 $17,186
310,668
kWh
$22,249
-
MMBtu
$(-665.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs