Assessment Year | 1992 |
---|---|
Principal Product | CORRUGATED PAPER CONTS. |
NAICS |
n/a
|
SIC | 2653: Corrugated and Solid Fiber Boxes |
Sales Range | $10 M to 50M |
# of Employees | 140 |
Plant Area |
n/a
|
Annual Production | 700,000
thousand feet
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $289,023 | 5,217,468 |
kWh
|
$0.055 |
Natural Gas | $187,644 | 56,022 |
MMBtu
|
$3.35 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $57,857 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $38,770 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $22,249 | $1,500 | - |
$22,249
-
MMBtu
|
- | |
02 | 2.2437: Recover waste heat from equipment | $8,758 | $1,247 | - |
$8,758
-
MMBtu
|
- | |
03 | 2.1213: Direct warmest air to combustion intake | $1,054 | $250 | - |
$1,054
-
MMBtu
|
- | |
04 | 2.6232: Install set-back timers | $8,958 | $19,000 |
$8,958
162,075
kWh
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,307 | $322 |
$6,972
126,026
kWh
|
- | $(-665.0) | |
06 | 2.6232: Install set-back timers | $5,731 | $3,033 |
$5,731
103,751
kWh
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $150 | $200 |
$150
2,638
kWh
|
- | - | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,333 | $100 |
$4,333
78,253
kWh
|
- | - | |
09 | 2.2511: Insulate bare equipment | $317 | $136 |
$280
4,982
kWh
|
$37
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $57,857 | $25,788 |
$26,424
477,725
kWh
|
$32,098
-
MMBtu
|
$(-665.0) | ||
TOTAL IMPLEMENTED | $38,770 | $5,155 |
$17,186
310,668
kWh
|
$22,249
-
MMBtu
|
$(-665.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs