ITAC Assessment: WV0703
ITAC logo
ITAC Assessment: WV0703
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Opal & Crystal Glass Products
NAICS 327212: Other Pressed and Blown Glass and Glassware Manufacturing
SIC 3229: Pressed and Blown Glass and Glassware, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 75
Plant Area 40,000
ft2
Annual Production 900
ton
Production Hrs. Annual 2,210
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $61,816 454,183
kWh
Natural Gas $127,264 41,765
MMBtu
TOTAL YEARLY COSTS $189,080
RECOMMENDED SAVINGS* $12,412 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $5,151 $3,159 - $5,151
-
MMBtu
02 2.2511: Insulate bare equipment $2,406 $972 - $2,406
-
MMBtu
03 2.1233: Analyze flue gas for proper air/fuel ratio $2,222 $2,159 - $2,222
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,104 $1,600 $1,104
8,118
kWh
-
05 2.2414: Use waste heat from hot flue gases to preheat $1,009 $3,255 - $1,009
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $520 $1,456 $520
3,823
kWh
-
TOTAL RECOMMENDED $12,412 $12,601 $1,624
11,941
kWh
$10,788
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs