ITAC Assessment: MZ0396
ITAC logo
ITAC Assessment: MZ0396
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Phosphoric acid and Sodium Phosphate
NAICS 325312: Phosphatic Fertilizer Manufacturing
SIC 2874: Phosphatic Fertilizers
Sales Range $100
M
to 500
M
# of Employees 175
Plant Area 697,000
ft2
Annual Production 100,000,000
lb
Production Hrs. Annual 8,640
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $945,740 27,774,826
kWh
Electricity Demand $1,238,066 49,286
kW-mo/yr
Natural Gas $3,277,100 773,224
MMBtu
Waste Disposal Costs
Water Usage $329,458 31,949
Tgal
Water Disposal $35,962 2,263
Tgal
TOTAL YEARLY COSTS $5,826,326
RECOMMENDED SAVINGS* $556,141 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.7135: Install occupancy sensors $606 $2,075 $606
17,826
kWh
- - -
02 2.7221: Lower temperature during the winter season and vice-versa $480 - $228
6,721
kWh
- $252
-
MMBtu
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $22,688 $26,142 $22,688
667,302
kWh
- - -
04 2.1116: Improve combustion control capability $201,607 $296,000 - - $201,607
-
MMBtu
-
05 2.9114: Use solar heat to make electricty $95,236 $1,204,387 $28,961
851,831
kWh
$128,784
-
kW-mo/yr
- $(-62,509.0)
06 2.1224: Replace boiler $232,201 $1,800,000 - - $232,201
-
MMBtu
-
07 2.4221: Install compressor air intakes in coolest locations $3,323 $8,500 $1,640
48,256
kWh
$1,683
-
kW-mo/yr
- -
TOTAL RECOMMENDED $556,141 $3,337,104 $54,123
1,591,936
kWh
$130,467
-
kW-mo/yr
$434,060
-
MMBtu
$(-62,509.0)
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs