ITAC Assessment: OR0587
ITAC logo
ITAC Assessment: OR0587
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Milk
NAICS 311511: Fluid Milk Manufacturing
SIC 2026: Fluid Milk
Sales Range $50
M
to 100
M
# of Employees 215
Plant Area 30,000
ft2
Annual Production 10,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $155,667 3,811,440
kWh
Electricity Demand $62,941 9,297
kW-mo/yr
Natural Gas $63,254 7,565
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $117,596 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,854

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4224: Upgrade controls on compressors $11,403 $11,403 $9,645
223,154
kWh
$1,758
-
kW-mo/yr
- - - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,687 $1,000 $1,270
29,381
kWh
$417
-
kW-mo/yr
- - - -
03 2.5122: Replace high resistance ducts, pipes, and fittings $15,142 $6,108 $232
5,369
kWh
- $14,910
-
MMBtu
- - -
04 2.2136: Install / repair insulation on steam lines $3,099 $1,560 - - - $3,099
-
MMBtu
- -
05 2.7135: Install occupancy sensors $2,854 $2,854 $1,826
42,246
kWh
$22
-
kW-mo/yr
- - $611 $395
06 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $7,810 $9,114 $5,332
123,378
kWh
$2,478
-
kW-mo/yr
- - - -
07 2.9141: Install anaerobic digester $75,601 $294,329 $32,599
754,263
kWh
- $56,892
-
MMBtu
- $(-13,890.0) -
TOTAL RECOMMENDED $117,596 $326,368 $50,904
1,177,791
kWh
$4,675
-
kW-mo/yr
$71,802
-
MMBtu
$3,099
-
MMBtu
$(-13,279.0) $395
TOTAL IMPLEMENTED $2,854 $2,854 $1,826
42,246
kWh
$22
-
kW-mo/yr
- - $611 $395
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs