Assessment Year | 2012 |
---|---|
Principal Product | Milk |
NAICS | 311511: Fluid Milk Manufacturing |
SIC | 2026: Fluid Milk |
Sales Range | $50 M to 100M |
# of Employees | 215 |
Plant Area |
30,000
ft2
|
Annual Production | 10,000,000
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $155,667 | 3,811,440 |
kWh
|
$0.041 |
Electricity Demand | $62,941 | 9,297 |
kW-mo/yr
|
$6.77 |
Natural Gas | $63,254 | 7,565 |
MMBtu
|
$8.36 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $117,596 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,854 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #2 Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4224: Upgrade controls on compressors | $11,403 | $11,403 |
$9,645
223,154
kWh
|
$1,758
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,687 | $1,000 |
$1,270
29,381
kWh
|
$417
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.5122: Replace high resistance ducts, pipes, and fittings | $15,142 | $6,108 |
$232
5,369
kWh
|
- |
$14,910
-
MMBtu
|
- | - | - | |
04 | 2.2136: Install / repair insulation on steam lines | $3,099 | $1,560 | - | - | - |
$3,099
-
MMBtu
|
- | - | |
05 | 2.7135: Install occupancy sensors | $2,854 | $2,854 |
$1,826
42,246
kWh
|
$22
-
kW-mo/yr
|
- | - | $611 | $395 | |
06 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $7,810 | $9,114 |
$5,332
123,378
kWh
|
$2,478
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.9141: Install anaerobic digester | $75,601 | $294,329 |
$32,599
754,263
kWh
|
- |
$56,892
-
MMBtu
|
- | $(-13,890.0) | - | |
TOTAL RECOMMENDED | $117,596 | $326,368 |
$50,904
1,177,791
kWh
|
$4,675
-
kW-mo/yr
|
$71,802
-
MMBtu
|
$3,099
-
MMBtu
|
$(-13,279.0) | $395 | ||
TOTAL IMPLEMENTED | $2,854 | $2,854 |
$1,826
42,246
kWh
|
$22
-
kW-mo/yr
|
- | - | $611 | $395 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #2 Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs