ITAC Assessment: AM0403
ITAC logo
ITAC Assessment: AM0403
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Expanded Polyolefin
NAICS
n/a
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $100
M
to 500
M
# of Employees 200
Plant Area
n/a
Annual Production 130,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,047,432 58,294,873
kWh
Electricity Demand $675,933 95,068
kW-mo/yr
Electricity Fees $31,608 -
Natural Gas $3,537,126 722,000
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $134,010 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $70,240

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 3.5316: Contract a wood pallet recycling company $36,000 - - - - - - - $36,000
02 3.4154: Eliminate leaks in water lines and valves $30,400 $1,770 - - - $30,400
-
Tgal
- - -
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $12,290 - - $12,290
-
kW-mo/yr
- - - - -
04 2.4314: Use synthetic lubricant $10,980 - $8,730
203,100
kWh
$2,250
-
kW-mo/yr
- - - - -
05 3.5248: Separate and recycle scrap metal to foundry or for sale $10,730 - - - - - $10,730
-
lb
- -
06 2.2121: Increase amount of condensate returned $16,000 $4,200 - - $5,100
-
MMBtu
$10,900
-
Tgal
- - -
07 2.7124: Make a practice of turning off lights when not needed $7,050 $5,890 $7,050
164,100
kWh
- - - - - -
08 3.4151: Minimize water usage $4,500 $5,100 $(-4,800.0)
(-111,000)
kWh
$(-1,200.0)
-
kW-mo/yr
- $10,500
-
Tgal
- - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $3,380 $2,640 $770
17,970
kWh
$190
-
kW-mo/yr
- - - $2,420 -
10 2.7124: Make a practice of turning off lights when not needed $1,400 - $1,400
32,900
kWh
- - - - - -
11 2.8114: Change rate schedules or other changes in utility service $900 - - $900
-
kW-mo/yr
- - - - -
12 2.7124: Make a practice of turning off lights when not needed $380 - $380
8,850
kWh
- - - - - -
TOTAL RECOMMENDED $134,010 $19,600 $13,530
315,920
kWh
$14,430
-
kW-mo/yr
$5,100
-
MMBtu
$51,800
-
Tgal
$10,730
-
lb
$2,420 $36,000
TOTAL IMPLEMENTED $70,240 $14,500 $9,600
223,820
kWh
$1,090
-
kW-mo/yr
$5,100
-
MMBtu
$41,300
-
Tgal
$10,730
-
lb
$2,420 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs