| Assessment Year | 2026 |
|---|---|
| Principal Product | Wood products |
| NAICS | 321113: Sawmills |
| SIC | 2421: Sawmills and Planing Mills, General |
| Sales Range | $10 M to 50M |
| # of Employees | 67 |
| Plant Area |
250,000
ft2
|
| Annual Production | 15,000
thousand feet
|
| Production Hrs. Annual | 2,500
hrs
|
| Location (State) | West Virginia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $313,387 | 3,498,589 |
kWh
|
$0.090 |
| Electricity Demand | $176,349 | 13,560 |
kW-mo/yr
|
$13.01 |
| Electricity Fees | $9,978 | - |
|
- |
| Natural Gas | $15,831 | 1,835 |
MMBtu
|
$8.63 |
| Wood | $170,554 | 44,185 |
MMBtu
|
$3.86 |
| TOTAL YEARLY COSTS | $686,099 | |||
| RECOMMENDED SAVINGS* | $28,173 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Wood Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $8,496 | $11,150 | - | - |
$8,496
-
MMBtu
|
- | |
| 02 | 2.4157: Establish a predictive maintenance program | $5,929 | $1,500 |
$5,219
58,252
kWh
|
$3,643
-
kW-mo/yr
|
- | $(-2,933.0) | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,696 | $4,150 |
$1,590
17,751
kWh
|
$1,106
-
kW-mo/yr
|
- | - | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,992 | $12,610 |
$3,107
34,675
kWh
|
$885
-
kW-mo/yr
|
- | - | |
| 05 | 2.2511: Insulate bare equipment | $2,470 | $6,896 | - | - |
$2,470
-
MMBtu
|
- | |
| 06 | 2.4151: Develop a repair/replace policy | $2,447 | $4,567 |
$2,447
27,306
kWh
|
- | - | - | |
| 07 | 2.4224: Upgrade controls on compressors | $1,542 | $3,230 |
$1,457
16,262
kWh
|
$85
-
kW-mo/yr
|
- | - | |
| 08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $601 | $600 |
$354
3,947
kWh
|
$247
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $28,173 | $44,703 |
$14,174
158,193
kWh
|
$5,966
-
kW-mo/yr
|
$10,966
-
MMBtu
|
$(-2,933.0) | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Wood Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs