ITAC Assessment: WV0702
ITAC logo
ITAC Assessment: WV0702
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Wood products
NAICS 321113: Sawmills
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 67
Plant Area 250,000
ft2
Annual Production 15,000
thousand feet
Production Hrs. Annual 2,500
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $313,387 3,498,589
kWh
Electricity Demand $176,349 13,560
kW-mo/yr
Electricity Fees $9,978 -
Natural Gas $15,831 1,835
MMBtu
Wood $170,554 44,185
MMBtu
TOTAL YEARLY COSTS $686,099
RECOMMENDED SAVINGS* $28,173 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Wood Savings Personnel Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $8,496 $11,150 - - $8,496
-
MMBtu
-
02 2.4157: Establish a predictive maintenance program $5,929 $1,500 $5,219
58,252
kWh
$3,643
-
kW-mo/yr
- $(-2,933.0)
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,696 $4,150 $1,590
17,751
kWh
$1,106
-
kW-mo/yr
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,992 $12,610 $3,107
34,675
kWh
$885
-
kW-mo/yr
- -
05 2.2511: Insulate bare equipment $2,470 $6,896 - - $2,470
-
MMBtu
-
06 2.4151: Develop a repair/replace policy $2,447 $4,567 $2,447
27,306
kWh
- - -
07 2.4224: Upgrade controls on compressors $1,542 $3,230 $1,457
16,262
kWh
$85
-
kW-mo/yr
- -
08 2.4231: Reduce the pressure of compressed air to the minimum required $601 $600 $354
3,947
kWh
$247
-
kW-mo/yr
- -
TOTAL RECOMMENDED $28,173 $44,703 $14,174
158,193
kWh
$5,966
-
kW-mo/yr
$10,966
-
MMBtu
$(-2,933.0)
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Wood Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs