ITAC Assessment: HO0026
ITAC logo
ITAC Assessment: HO0026
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product SHEET METAL PRODUCTS
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area
n/a
Annual Production 480
ton
Production Hrs. Annual 2,040
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $63,010 449,297
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,308 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $435 $928 $479
3,517
kWh
- $(-44.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $259 $324 $259
1,758
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,756 $5,720 $1,756
12,603
kWh
- -
04 2.4133: Use most efficient type of electric motors $97 $75 $97
879
kWh
- -
05 2.7494: Install storm windows and doors $2,264 $1,240 - $2,264
-
MMBtu
-
06 2.4221: Install compressor air intakes in coolest locations $497 $700 $497
3,517
kWh
- -
TOTAL RECOMMENDED $5,308 $8,987 $3,088
22,274
kWh
$2,264
-
MMBtu
$(-44.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs