Assessment Year | 1991 |
---|---|
Principal Product | SOLID WOOD DOORS |
NAICS |
n/a
|
SIC | 2431: Millwork |
Sales Range | $10 M to 50M |
# of Employees | 280 |
Plant Area |
n/a
|
Annual Production | 414,450
pieces
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $310,916 | 10,507,913 |
kWh
|
$0.030 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $67,058 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Wood Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $30,780 | $600 | - |
$30,780
-
MMBtu
|
- | |
02 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $3,126 | $2,580 | - |
$3,126
-
MMBtu
|
- | |
03 | 2.2123: Insulate feedwater tank | $553 | $496 | - |
$553
-
MMBtu
|
- | |
04 | 2.3212: Optimize plant power factor | $13,571 | $12,150 |
$13,571
-
kWh
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,373 | $6,000 |
$5,373
227,726
kWh
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,080 | - |
$532
17,878
kWh
|
- | $548 | |
07 | 2.5123: Reduce fluid flow rates | $5,381 | $12,545 |
$5,381
298,359
kWh
|
- | - | |
08 | 2.4133: Use most efficient type of electric motors | $1,268 | $4,135 |
$1,268
37,808
kWh
|
- | - | |
09 | 2.2441: Preheat boiler makeup water with waste process heat | $2,630 | $8,930 | - |
$2,630
-
MMBtu
|
- | |
10 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,296 | $14,125 |
$3,296
115,475
kWh
|
- | - | |
TOTAL RECOMMENDED | $67,058 | $61,561 |
$29,421
697,246
kWh
|
$37,089
-
MMBtu
|
$548 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Wood Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs