ITAC Assessment: OR0119
ITAC logo
ITAC Assessment: OR0119
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product SOLID WOOD DOORS
NAICS
n/a
SIC 2431: Millwork
Sales Range $10
M
to 50
M
# of Employees 280
Plant Area
n/a
Annual Production 414,450
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $310,916 10,507,913
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $67,058 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Wood Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $30,780 $600 - $30,780
-
MMBtu
-
02 2.1131: Repair faulty insulation in furnaces, boilers, etc $3,126 $2,580 - $3,126
-
MMBtu
-
03 2.2123: Insulate feedwater tank $553 $496 - $553
-
MMBtu
-
04 2.3212: Optimize plant power factor $13,571 $12,150 $13,571
-
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,373 $6,000 $5,373
227,726
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,080 - $532
17,878
kWh
- $548
07 2.5123: Reduce fluid flow rates $5,381 $12,545 $5,381
298,359
kWh
- -
08 2.4133: Use most efficient type of electric motors $1,268 $4,135 $1,268
37,808
kWh
- -
09 2.2441: Preheat boiler makeup water with waste process heat $2,630 $8,930 - $2,630
-
MMBtu
-
10 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,296 $14,125 $3,296
115,475
kWh
- -
TOTAL RECOMMENDED $67,058 $61,561 $29,421
697,246
kWh
$37,089
-
MMBtu
$548
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Wood Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs