ITAC Assessment: NV0080
ITAC logo
ITAC Assessment: NV0080
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Aftermarket and OEM vehicle fuel tanks
NAICS
n/a
SIC 3417:
Sales Range $1
M
to 5
M
# of Employees 37
Plant Area 30,000
ft2
Annual Production 1,090,000
lb
Production Hrs. Annual 2,210
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $25,091 297,773
kWh
Electricity Demand $5,238 1,387
kW-mo/yr
Electricity Fees $2,522 -
Natural Gas $7,762 1,331
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,489 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,761

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.2525: Eliminate cooling of process streams which subsequently must be heated and vice versa $1,252 $200 - - $1,252
-
MMBtu
- -
02 2.7111: Reduce illumination to minimum necessary levels $728 $50 $608
7,327
kWh
$120
-
kW-mo/yr
- - -
03 2.7124: Make a practice of turning off lights when not needed $1,478 $125 $762
9,086
kWh
$716
-
kW-mo/yr
- - -
04 2.1135: Repair furnaces and oven doors so that they seal efficiently $729 $100 - - $729
-
MMBtu
- -
05 3.5248: Separate and recycle scrap metal to foundry or for sale $336 $100 - - - $336
-
lb
-
06 4.425: Eliminate/reduce redundant inspections $14,966 $7,500 - - - - $14,966
TOTAL RECOMMENDED $19,489 $8,075 $1,370
16,413
kWh
$836
-
kW-mo/yr
$1,981
-
MMBtu
$336
-
lb
$14,966
TOTAL IMPLEMENTED $18,761 $8,025 $762
9,086
kWh
$716
-
kW-mo/yr
$1,981
-
MMBtu
$336
-
lb
$14,966
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs