ITAC Assessment: UL2432
ITAC logo
ITAC Assessment: UL2432
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Museum
NAICS 712110: Museums
SIC 8412: Museums and Art Galleries
Sales Range $500
k
to 1
M
# of Employees 30
Plant Area 208,182
ft2
Annual Production 1
units
Production Hrs. Annual 1,000
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $139,804 4,011,820
kWh
Electricity Demand $202,313 7,855
kW-mo/yr
Electricity Fees $42,083 -
Natural Gas $164,886 23,292
MMBtu
TOTAL YEARLY COSTS $549,086
RECOMMENDED SAVINGS* $217,735 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,321 $905 $2,146
61,653
kWh
$2,175
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $1,383 $2,313 $1,383
39,729
kWh
- -
03 2.9114: Use solar heat to make electricty $9,036 $76,988 $3,892
111,827
kWh
$5,144
-
kW-mo/yr
-
04 2.7233: Use properly designed and sized hvac equipment $192,912 $100,000 $16,246
464,175
kWh
$29,858
-
kW-mo/yr
$146,808
-
MMBtu
05 2.7241: Install outside air damper / economizer on hvac unit $6,518 $25,000 $6,011
171,733
kWh
$507
-
kW-mo/yr
-
06 2.2623: Minimize condenser cooling water temperature $3,565 $9,700 $1,719
49,122
kWh
$(-692.0)
-
kW-mo/yr
$2,538
-
MMBtu
TOTAL RECOMMENDED $217,735 $214,906 $31,397
898,239
kWh
$36,992
-
kW-mo/yr
$149,346
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs