Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,873

matching recommendations
$
$
ARC Electrical power
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
KS2437 #09 Y:2024 Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $65,208 $627,000
UD1101 #11 Y:2024 Optimize plant power factor $1,101 $4,400
MI0454 #01 Y:2024 Reschedule plant operations or reduce load to avoid peaks $2,818 -
TR0060 #02 Y:2024 Optimize plant power factor $27,671 $119,707
NL0104 #02 Y:2024 Recharge batteries on during off-peak demand periods $3,070 $450
UD1100 #06 Y:2024 Reschedule plant operations or reduce load to avoid peaks $3,587 -
UD1100 #05 Y:2024 Optimize plant power factor $12,387 $23,400
LE0588 #04 Y:2024 Reschedule plant operations or reduce load to avoid peaks $13,600 $26,934
IP0203 #05 Y:2024 Use demand controller or load shedder $64,223 $20,000
UU0264 #03 Y:2024 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $729,671 $3,645,455
UC2417 #02 Y:2024 Optimize plant power factor $2,644 $9,173
UU0263 #09 Y:2024 Optimize plant power factor $3,940 $9,000
UD1099 #01 Y:2024 Reschedule plant operations or reduce load to avoid peaks $4,391 -
SJ0030 #02 Y:2024 Use battery storage for demand control $18,627 $195,217
SD0664 #02 Y:2024 Use battery storage for demand control $82,562 $4,772
MU0061 #01 Y:2024 Recharge batteries on during off-peak demand periods $3,468 $4,140
KS2435 #05 Y:2024 Reschedule plant operations or reduce load to avoid peaks $2,807 -
SU0565 #01 Y:2024 Reschedule plant operations or reduce load to avoid peaks $6,336 -
GT0990 #06 Y:2024 Optimize plant power factor $2,014 $8,907
UF0624 #03 Y:2024 Use battery storage for demand control $11,217 $21,658