Assessment Year | 2025 |
---|---|
Principal Product | HVAC units for RVs |
NAICS | 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen |
SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
Sales Range | $100 M to 500M |
# of Employees | 368 |
Plant Area |
156,000
ft2
|
Annual Production | 450,000
units
|
Production Hrs. Annual | 2,860
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $206,058 | 2,943,688 |
kWh
|
$0.070 | |
Electricity Demand | $173,533 | 10,250 |
kW-mo/yr
|
$16.93 | |
Electricity Fees | $44,305 | - |
|
- | |
Natural Gas | $42,442 | 4,321 |
MMBtu
|
$9.82 | |
Other Gas | $6,372 | 1 |
MMBtu
|
$6,372.00 | |
Waste Disposal Costs | |||||
Water Usage | $16,594 | 1,720 |
Tgal
|
$9.65 | |
Water Disposal | $6,723 | 1,354 |
Tgal
|
$4.97 | |
Other Liquid (non-haz) | $991 | 1 |
gal
|
$991.00 | |
TOTAL YEARLY COSTS | $497,018 | ||||
RECOMMENDED SAVINGS* | $64,431 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,489 | $1,176 |
$5,489
78,420
kWh
|
- | - | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $687 | - |
$687
9,820
kWh
|
- | - | - | |
03 | 2.2437: Recover waste heat from equipment | $2,712 | $1,080 | - | - |
$2,712
-
MMBtu
|
- | |
04 | 2.4239: Eliminate or reduce compressed air usage | $5,012 | - |
$5,012
71,593
kWh
|
- | - | - | |
05 | 2.3212: Optimize plant power factor | $15,914 | $8,034 | - | - | - | $15,914 | |
06 | 2.8121: Apply for tax-free status for energy purchases | $17,308 | - | - | - | - | $17,308 | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,474 | $13,679 |
$3,003
42,902
kWh
|
$3,471
-
kW-mo/yr
|
- | - | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $10,835 | $21,094 |
$10,835
154,779
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $64,431 | $45,063 |
$25,026
357,514
kWh
|
$3,471
-
kW-mo/yr
|
$2,712
-
MMBtu
|
$33,222 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs