| Assessment Year | 2003 |
|---|---|
| Principal Product | Adhesives, Glue, and Gummed Paper Tape |
| NAICS | 325520: Adhesive Manufacturing |
| SIC | 2891: Adhesives and Sealants |
| Sales Range | $5 M to 10M |
| # of Employees | 26 |
| Plant Area |
45,000
ft2
|
| Annual Production | 4,500,000
lb
|
| Production Hrs. Annual | 2,875
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $47,742 | 349,520 |
kWh
|
$0.14 |
| Electricity Demand | $9,055 | 2,151 |
kW-mo/yr
|
$4.21 |
| Natural Gas | $19,040 | 2,897 |
MMBtu
|
$6.57 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $30,240 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $3,621 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,775 | $500 |
$3,275
23,977
kWh
|
- | - | $(-500.0) | - | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $636 | $814 |
$544
3,981
kWh
|
$92
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.2314: Replace heat treating oven with more efficient unit | $2,342 | $4,612 |
$2,792
20,442
kWh
|
$123
-
kW-mo/yr
|
$(-573.0)
-
MMBtu
|
- | - | |
| 04 | 2.4239: Eliminate or reduce compressed air usage | $846 | $2,550 |
$797
5,838
kWh
|
$49
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.9121: Install wind powered electric generator | $23,641 | $205,000 |
$27,731
204,480
kWh
|
- | - | - | $(-4,090.0) | |
| TOTAL RECOMMENDED | $30,240 | $213,476 |
$35,139
258,718
kWh
|
$264
-
kW-mo/yr
|
$(-573.0)
-
MMBtu
|
$(-500.0) | $(-4,090.0) | ||
| TOTAL IMPLEMENTED | $3,621 | $3,050 |
$4,072
29,815
kWh
|
$49
-
kW-mo/yr
|
- | $(-500.0) | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs