ITAC Assessment: SF0252
ITAC logo
ITAC Assessment: SF0252
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Adhesives, Glue, and Gummed Paper Tape
NAICS 325520: Adhesive Manufacturing
SIC 2891: Adhesives and Sealants
Sales Range $5
M
to 10
M
# of Employees 26
Plant Area 45,000
ft2
Annual Production 4,500,000
lb
Production Hrs. Annual 2,875
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $47,742 349,520
kWh
Electricity Demand $9,055 2,151
kW-mo/yr
Natural Gas $19,040 2,897
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,240 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,621

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,775 $500 $3,275
23,977
kWh
- - $(-500.0) -
02 2.4231: Reduce the pressure of compressed air to the minimum required $636 $814 $544
3,981
kWh
$92
-
kW-mo/yr
- - -
03 2.2314: Replace heat treating oven with more efficient unit $2,342 $4,612 $2,792
20,442
kWh
$123
-
kW-mo/yr
$(-573.0)
-
MMBtu
- -
04 2.4239: Eliminate or reduce compressed air usage $846 $2,550 $797
5,838
kWh
$49
-
kW-mo/yr
- - -
05 2.9121: Install wind powered electric generator $23,641 $205,000 $27,731
204,480
kWh
- - - $(-4,090.0)
TOTAL RECOMMENDED $30,240 $213,476 $35,139
258,718
kWh
$264
-
kW-mo/yr
$(-573.0)
-
MMBtu
$(-500.0) $(-4,090.0)
TOTAL IMPLEMENTED $3,621 $3,050 $4,072
29,815
kWh
$49
-
kW-mo/yr
- $(-500.0) -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs