Assessment Year | 2025 |
---|---|
Principal Product | Painting & Powder coating |
NAICS | 325510: Paint and Coating Manufacturing |
SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 95 |
Plant Area |
50,000
ft2
|
Annual Production | 1,000,000
units
|
Production Hrs. Annual | 2,168
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $148,665 | 783,917 |
kWh
|
$0.19 |
Electricity Demand | $31,553 | 1,418 |
kW-mo/yr
|
$22.25 |
Natural Gas | $42,433 | 1,973 |
MMBtu
|
$21.51 |
LPG | $2,299 | 80 |
MMBtu
|
$28.88 |
TOTAL YEARLY COSTS | $224,950 | |||
RECOMMENDED SAVINGS* | $26,668 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $6,128 | - |
$1,053
5,544
kWh
|
$5,075
-
kW-mo/yr
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,648 | - |
$8,648
45,518
kWh
|
- | - | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,392 | $8,756 |
$877
4,618
kWh
|
$1,515
-
kW-mo/yr
|
- | - | |
04 | 2.2443: Re-use or recycle hot or cold process exhaust air | $2,538 | $13,895 | - | - | - |
$2,538
-
MMBtu
|
|
05 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $3,629 | $10,000 |
$3,629
19,101
kWh
|
- | - | - | |
06 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,027 | - | - |
$3,611
-
kW-mo/yr
|
$(-2,584.0) | - | |
07 | 2.7135: Install occupancy sensors | $1,025 | $537 |
$181
950
kWh
|
$844
-
kW-mo/yr
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,154 | $13,497 |
$700
3,685
kWh
|
$454
-
kW-mo/yr
|
- | - | |
09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $127 | $25 |
$82
430
kWh
|
$45
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $26,668 | $46,710 |
$15,170
79,846
kWh
|
$11,544
-
kW-mo/yr
|
$(-2,584.0) |
$2,538
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs