ITAC Assessment: SJ0038
ITAC logo
ITAC Assessment: SJ0038
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Painting & Powder coating
NAICS 325510: Paint and Coating Manufacturing
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 95
Plant Area 50,000
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 2,168
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $68,667 263,162
kWh
Electricity Demand $31,553 1,418
kW-mo/yr
Electricity Fees $79,998 -
Natural Gas $42,433 1,973
MMBtu
LPG $2,299 80
MMBtu
TOTAL YEARLY COSTS $224,950
RECOMMENDED SAVINGS* $38,445 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $6,522 - $1,447
5,544
kWh
$5,075
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $14,685 - $11,880
45,518
kWh
$2,805
-
kW-mo/yr
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,717 $8,756 $1,205
4,618
kWh
$1,512
-
kW-mo/yr
- -
04 2.2443: Re-use or recycle hot or cold process exhaust air $2,538 $13,895 - - - $2,538
-
MMBtu
05 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $9,704 $11,250 $4,985
19,101
kWh
$4,719
-
kW-mo/yr
- -
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,027 - - $3,611
-
kW-mo/yr
$(-2,584.0) -
07 2.7135: Install occupancy sensors $1,092 $537 $248
950
kWh
$844
-
kW-mo/yr
- -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $160 $25 $115
441
kWh
$45
-
kW-mo/yr
- -
TOTAL RECOMMENDED $38,445 $34,463 $19,880
76,172
kWh
$18,611
-
kW-mo/yr
$(-2,584.0) $2,538
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs