Assessment Year | 2025 |
---|---|
Principal Product | Metallized films |
NAICS | 334416: Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing |
SIC | 3675: Electronic Capacitors |
Sales Range | $5 M to 10M |
# of Employees | 42 |
Plant Area |
126,000
ft2
|
Annual Production | 493,000
lb
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $489,816 | 3,123,412 |
kWh
|
$0.16 |
Electricity Demand | $112,654 | 11,555 |
kW-mo/yr
|
$9.75 |
Electricity Fees | $36,525 | - |
|
- |
Fuel Oil #2 | $152,753 | 7,431 |
MMBtu
|
$20.56 |
TOTAL YEARLY COSTS | $791,748 | |||
RECOMMENDED SAVINGS* | $146,877 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.8121: Apply for tax-free status for energy purchases | $28,237 | - | - | - | - | $28,237 | |
02 | 2.8123: Pay utility bills on time | $114 | - | - | - | - | $114 | |
03 | 2.3212: Optimize plant power factor | $19,546 | $32,370 | - | - | - | $19,546 | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,936 | $100 |
$2,511
16,011
kWh
|
$425
-
kW-mo/yr
|
- | - | |
05 | 2.1224: Replace boiler | $42,258 | $132,297 | - | - |
$42,258
-
MMBtu
|
- | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,269 | $1,190 |
$2,269
14,469
kWh
|
- | - | - | |
07 | 2.2511: Insulate bare equipment | $8,347 | $2,798 | - | - |
$8,347
-
MMBtu
|
- | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $29,692 | $9,100 |
$27,361
174,499
kWh
|
$2,331
-
kW-mo/yr
|
- | - | |
09 | 2.6231: Utilize controls to operate equipment only when needed | $13,478 | $50 |
$13,478
85,955
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $146,877 | $177,904 |
$45,619
290,934
kWh
|
$2,756
-
kW-mo/yr
|
$50,605
-
MMBtu
|
$47,897 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs