ITAC Assessment: SD0679
ITAC logo
ITAC Assessment: SD0679
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Cementitious Material
NAICS 488490: Other Support Activities for Road Transportation
SIC 4789: Transportation Services, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 4
Plant Area 6,103
ft2
Annual Production 98,805
ton
Production Hrs. Annual 2,730
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $60,292 217,767
kWh
Electricity Demand $94,351 2,510
kW-mo/yr
TOTAL YEARLY COSTS $154,643
RECOMMENDED SAVINGS* $214,142 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.9114: Use solar heat to make electricty $146,915 $287,273 $146,915
530,570
kWh
-
02 2.3141: Use battery storage for demand control $18,281 $1,472 $(-3,180.7)
(-11,487)
kWh
$21,462
-
kW-mo/yr
03 2.4231: Reduce the pressure of compressed air to the minimum required $5,125 - $5,125
18,508
kWh
-
04 2.3132: Recharge batteries on during off-peak demand periods $10,098 - - $10,098
-
kW-mo/yr
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $33,723 $25,291 $33,723
121,787
kWh
-
TOTAL RECOMMENDED $214,142 $314,036 $182,582
659,378
kWh
$31,560
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs