ITAC Assessment: MU0070
ITAC logo
ITAC Assessment: MU0070
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Carbon steel, Aluminum steel and stainless Steel
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 65
Plant Area 187,000
ft2
Annual Production 73,000
ton
Production Hrs. Annual 4,420
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $75,845 819,786
kWh
Electricity Demand $22,321 3,827
kW-mo/yr
Electricity Fees $18,592 -
Natural Gas $28,029 4,008
MMBtu
Other Gas $2,813 1
MMBtu
Waste Disposal Costs
Water Usage $6,443 629
Tgal
TOTAL YEARLY COSTS $154,043
RECOMMENDED SAVINGS* $10,522 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.8122: Use utility controlled power management $5,350 - - - - - $5,350
02 2.3212: Optimize plant power factor $1,332 $6,432 - - - - $1,332
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $121 $177 $94
1,007
kWh
$28
-
kW-mo/yr
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $330 $75 $282
3,037
kWh
$48
-
kW-mo/yr
- - -
05 2.4322: Use or replace with energy efficient substitutes $173 $1,250 $159
1,708
kWh
$14
-
kW-mo/yr
- - -
06 2.4322: Use or replace with energy efficient substitutes $881 - $251
2,700
kWh
$630
-
kW-mo/yr
- - -
07 2.7111: Reduce illumination to minimum necessary levels $660 - $499
5,370
kWh
$160
-
kW-mo/yr
- - -
08 2.7134: Use photocell controls $150 $296 $113
1,217
kWh
$36
-
kW-mo/yr
- - -
09 2.7135: Install occupancy sensors $545 $348 $402
4,321
kWh
$143
-
kW-mo/yr
- - -
10 2.7423: Reduce heat gain by window tinting $550 $6,426 $491
5,275
kWh
$59
-
kW-mo/yr
- - -
11 2.7444: Close holes and openings in building such as broken windows $6 $65 $1
5
kWh
$0.1
-
kW-mo/yr
- $6
-
MMBtu
-
12 2.7492: Use proper thickness of insulation on building envelope $185 $352 - - - $185
-
MMBtu
-
13 2.7492: Use proper thickness of insulation on building envelope $61 $152 - - - $61
-
MMBtu
-
14 4.821: Pay bills on time to avoid late fees $178 - - - $178 - -
TOTAL RECOMMENDED $10,522 $15,572 $2,292
24,640
kWh
$1,118
-
kW-mo/yr
$178 $252
-
MMBtu
$6,682
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs