ITAC Assessment: OD0042
ITAC logo
ITAC Assessment: OD0042
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Small Household Electrical Appliances
NAICS
n/a
SIC 3634: Electric Housewares and Fans
Sales Range $50
M
to 100
M
# of Employees 1,000
Plant Area 387,200
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 8,232
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,118,792 16,008,500
kWh
Natural Gas $16,581 2,814
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $113,393 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $102,941

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 3.4155: Meter waste water $32,200 $717 - $32,200
02 2.4323: Use optimum size and capacity equipment $29,544 $5,168 $29,544
483,001
kWh
-
03 2.4133: Use most efficient type of electric motors $37,136 $66,487 $37,136
587,925
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,061 $3,657 $4,061
66,237
kWh
-
05 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $7,916 $2,449 $7,916
179,074
kWh
-
06 2.7261: Install timers and/or thermostats $2,074 $1,170 $2,074
46,893
kWh
-
07 2.4238: Do not use compressed air for personal cooling $462 $20 $462
3,517
kWh
-
TOTAL RECOMMENDED $113,393 $79,668 $81,193
1,366,647
kWh
$32,200
TOTAL IMPLEMENTED $102,941 $76,029 $70,741
1,137,163
kWh
$32,200
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs