ITAC Assessment: IC0097
ITAC logo
ITAC Assessment: IC0097
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Pessure Sensitive Prime Labels
NAICS 323113: Commercial Screen Printing
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 53,000
ft2
Annual Production 0
pieces
Production Hrs. Annual 6,800
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $57,223 1,374,569
kWh
Electricity Demand $42,528 3,434
kW-mo/yr
Electricity Fees $1,511 -
Natural Gas $16,374 2,115
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,162 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,422

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,330 $700 $1,533
36,524
kWh
$797
-
kW-mo/yr
- - -
02 2.2522: Isolate hot or cold equipment $1,426 $3,768 $658
15,663
kWh
$768
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $9,092 $41,838 $4,342
103,398
kWh
$2,550
-
kW-mo/yr
- $396 $1,804
04 2.4133: Use most efficient type of electric motors $1,151 $5,789 $755
18,005
kWh
$396
-
kW-mo/yr
- - -
05 2.2211: Use optimum temperature $163 $1,044 - - $163
-
MMBtu
- -
TOTAL RECOMMENDED $14,162 $53,139 $7,288
173,590
kWh
$4,511
-
kW-mo/yr
$163
-
MMBtu
$396 $1,804
TOTAL IMPLEMENTED $11,422 $42,538 $5,875
139,922
kWh
$3,347
-
kW-mo/yr
- $396 $1,804
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs