ITAC Assessment: UD1117
ITAC logo
ITAC Assessment: UD1117
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Copper and Aluminum Conductors, electrical insulation and steel components
NAICS 332322: Sheet Metal Work Manufacturing
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 287
Plant Area 207,000
ft2
Annual Production 10,239,108
units
Production Hrs. Annual 5,408
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $257,056 3,696,832
kWh
Electricity Demand $131,776 9,517
kW-mo/yr
Electricity Fees $13,723 -
Natural Gas $19,851 8,413
MMBtu
Waste Disposal Costs
Water Usage $2,997 777
Tgal
Water Disposal $6,585 775
Tgal
Other Liquid (non-haz) $26,786 1
gal
TOTAL YEARLY COSTS $458,774
RECOMMENDED SAVINGS* $30,970 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $3,656 $1,015 $2,524
36,313
kWh
$1,132
-
kW-mo/yr
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,150 - $1,491
21,431
kWh
$659
-
kW-mo/yr
- -
03 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $2,839 $947 $1,918
27,594
kWh
- - $921
-
MMBtu
04 2.3212: Optimize plant power factor $13,183 $15,550 - - $13,183 -
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $8,113 - - $8,113
-
kW-mo/yr
- -
06 2.2437: Recover waste heat from equipment $1,029 $4,975 $(-65.0)
(-934)
kWh
$(-29.0)
-
kW-mo/yr
- $1,123
-
MMBtu
TOTAL RECOMMENDED $30,970 $22,487 $5,868
84,404
kWh
$9,875
-
kW-mo/yr
$13,183 $2,044
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs