| Assessment Year | 2025 |
|---|---|
| Principal Product | Propane cylinders |
| NAICS | 332439: Other Metal Container Manufacturing |
| SIC | 3443: Fabricated Plate Work (Boiler Shops) |
| Sales Range | $50 M to 100M |
| # of Employees | 140 |
| Plant Area |
130,000
ft2
|
| Annual Production | 30,500,000
lb
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Kansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $787,061 | 19,676,536 |
kWh
|
$0.040 | |
| Electricity Demand | $732,550 | 31,850 |
kW-mo/yr
|
$23.00 | |
| Electricity Fees | $88,838 | - |
|
- | |
| Natural Gas | $724,806 | 120,801 |
MMBtu
|
$6.00 | |
| Other Gas | $14,919 | 1 |
MMBtu
|
$14,919.00 | |
| Waste Disposal Costs | |||||
| Water Usage | $14,615 | 1,423 |
Tgal
|
$10.27 | |
| Water Disposal | $20,891 | 1,423 |
Tgal
|
$14.68 | |
| Other Liquid (non-haz) | $120 | 1 |
gal
|
$120.00 | |
| TOTAL YEARLY COSTS | $2,383,800 | ||||
| RECOMMENDED SAVINGS* | $150,163 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.3212: Optimize plant power factor | $13,156 | $11,709 | - | - | - | $13,156 | |
| 02 | 2.2437: Recover waste heat from equipment | $8,442 | $1,920 | - | - |
$8,442
-
MMBtu
|
- | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,188 | - |
$1,188
29,696
kWh
|
- | - | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $18,445 | $2,615 |
$18,445
461,126
kWh
|
- | - | - | |
| 05 | 2.4239: Eliminate or reduce compressed air usage | $723 | $621 |
$723
18,068
kWh
|
- | - | - | |
| 06 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $7,470 | $1,913 | - | - |
$7,470
-
MMBtu
|
- | |
| 07 | 2.7211: Clean and maintain refrigerant condensers and towers | $878 | $1,980 |
$878
21,946
kWh
|
- | - | - | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $20,326 | $16,391 |
$12,598
314,956
kWh
|
$7,728
-
kW-mo/yr
|
- | - | |
| 09 | 2.9114: Use solar heat to make electricty | $12,341 | $218,400 |
$12,341
308,523
kWh
|
- | - | - | |
| 10 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $67,194 | $36,360 |
$67,194
1,679,850
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $150,163 | $291,909 |
$113,367
2,834,165
kWh
|
$7,728
-
kW-mo/yr
|
$15,912
-
MMBtu
|
$13,156 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs