Assessment Year 2004
Principal Product Metal expansion joints, pipe supports, pressure vessels, tanks
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3531: Construction Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 400
Plant Area 450,000
ft2
Annual Production 12,000,000
lb
Production Hrs. Annual 6,330
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $194,369 3,263,988
kWh
Electricity Demand $33,654 9,480
kW-mo/yr
Natural Gas $63,642 18,095
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $93,535 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $73,145

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $66,000 $50 - - - $13,200 $52,800
02 2.7121: Utilize daylight whenever possible in lieu of artificial light $7,490 - $9,740
162,200
kWh
- $(-2,250.0) - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,715 - $3,340
55,700
kWh
$375
-
kW-mo/yr
- - -
04 2.8121: Apply for tax-free status for energy purchases $11,300 $230 - - - $2,260 $9,040
05 2.7134: Use photocell controls $1,600 $2,440 $1,400
23,300
kWh
$200
-
kW-mo/yr
- - -
06 2.3212: Optimize plant power factor $790 - - $790
-
kW-mo/yr
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $585 - $125
2,080
kWh
$10
-
kW-mo/yr
$450 - -
08 2.4314: Use synthetic lubricant $445 - $410
6,850
kWh
$35
-
kW-mo/yr
- - -
09 2.8123: Pay utility bills on time $400 $170 - - - $400 -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $370 $1,130 $300
5,090
kWh
$70
-
kW-mo/yr
- - -
11 2.8112: Combine utility meters $255 $600 - - - $255 -
12 2.8118: Check for accuracy of utility / power meters $585 $12,000 - - - - $585
TOTAL RECOMMENDED $93,535 $16,620 $15,315
255,220
kWh
$1,480
-
kW-mo/yr
$(-1,800.0) $16,115 $62,425
TOTAL IMPLEMENTED $73,145 $13,950 $4,175
69,720
kWh
$1,280
-
kW-mo/yr
$450 $13,855 $53,385
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs