Assessment Year | 2016 |
---|---|
Principal Product | Solid Dosage Pharmaceuticals |
NAICS | 325412: Pharmaceutical Preparation Manufacturing |
SIC | 2834: Pharmaceutical Preparations |
Sales Range | $10 M to 50M |
# of Employees | 80 |
Plant Area |
136,000
ft2
|
Annual Production | 120
units
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Puerto Rico |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,580,135 | 10,066,672 |
kWh
|
$0.16 |
Electricity Demand | $152,665 | 17,580 |
kW-mo/yr
|
$8.68 |
Electricity Fees | $42,929 | - |
|
- |
LPG | $158,579 | 9,669 |
MMBtu
|
$16.40 |
TOTAL YEARLY COSTS | $1,934,308 | |||
RECOMMENDED SAVINGS* | $530,595 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $329,104 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7425: Clean or color roof to reduce solar load | $98,547 | $35,359 |
$85,547
544,884
kWh
|
$13,000
-
kW-mo/yr
|
- | - | |
02 | 2.7444: Close holes and openings in building such as broken windows | $96,255 | $386 |
$89,475
569,907
kWh
|
$6,780
-
kW-mo/yr
|
- | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $75,921 | $15,156 |
$65,474
417,034
kWh
|
$10,447
-
kW-mo/yr
|
- | - | |
04 | 2.6218: Turn off equipment when not in use | $68,863 | $173 |
$68,863
438,616
kWh
|
- | - | - | |
05 | 2.6218: Turn off equipment when not in use | $47,043 | $12,140 |
$39,123
249,194
kWh
|
$7,920
-
kW-mo/yr
|
- | - | |
06 | 2.8123: Pay utility bills on time | $37,529 | - | - | - | - | $37,529 | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $23,599 | $40 |
$21,827
139,028
kWh
|
$1,772
-
kW-mo/yr
|
- | - | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $23,521 | $1,660 |
$20,082
127,913
kWh
|
$3,439
-
kW-mo/yr
|
- | - | |
09 | 2.4321: Upgrade obsolete equipment | $15,163 | $4,691 |
$14,225
90,607
kWh
|
$938
-
kW-mo/yr
|
- | - | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,807 | $22,446 |
$9,805
62,451
kWh
|
$2,002
-
kW-mo/yr
|
- | - | |
11 | 2.7135: Install occupancy sensors | $7,917 | $1,281 |
$7,917
50,425
kWh
|
- | - | - | |
12 | 2.2515: Use optimum thickness insulation | $6,276 | $1,644 | - | - |
$6,276
-
MMBtu
|
- | |
13 | 2.7221: Lower temperature during the winter season and vice-versa | $5,924 | $40 |
$5,924
37,730
kWh
|
- | - | - | |
14 | 2.1233: Analyze flue gas for proper air/fuel ratio | $5,797 | $2,520 | - | - |
$5,797
-
MMBtu
|
- | |
15 | 2.4239: Eliminate or reduce compressed air usage | $5,584 | $5,100 |
$4,855
30,924
kWh
|
$729
-
kW-mo/yr
|
- | - | |
16 | 2.7444: Close holes and openings in building such as broken windows | $849 | $29 |
$789
5,023
kWh
|
$60
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $530,595 | $102,665 |
$433,906
2,763,736
kWh
|
$47,087
-
kW-mo/yr
|
$12,073
-
MMBtu
|
$37,529 | ||
TOTAL IMPLEMENTED | $329,104 | $40,715 |
$263,805
1,680,287
kWh
|
$21,973
-
kW-mo/yr
|
$5,797
-
MMBtu
|
$37,529 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs