ITAC Assessment: MI0300
ITAC logo
ITAC Assessment: MI0300
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Solid Dosage Pharmaceuticals
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 136,000
ft2
Annual Production 120
units
Production Hrs. Annual 4,160
hrs
Location (State) Puerto Rico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,580,135 10,066,672
kWh
Electricity Demand $152,665 17,580
kW-mo/yr
Electricity Fees $42,929 -
LPG $158,579 9,669
MMBtu
TOTAL YEARLY COSTS $1,934,308
RECOMMENDED SAVINGS* $530,595 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $329,104

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Administrative Changes Savings
01 2.7425: Clean or color roof to reduce solar load $98,547 $35,359 $85,547
544,884
kWh
$13,000
-
kW-mo/yr
- -
02 2.7444: Close holes and openings in building such as broken windows $96,255 $386 $89,475
569,907
kWh
$6,780
-
kW-mo/yr
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $75,921 $15,156 $65,474
417,034
kWh
$10,447
-
kW-mo/yr
- -
04 2.6218: Turn off equipment when not in use $68,863 $173 $68,863
438,616
kWh
- - -
05 2.6218: Turn off equipment when not in use $47,043 $12,140 $39,123
249,194
kWh
$7,920
-
kW-mo/yr
- -
06 2.8123: Pay utility bills on time $37,529 - - - - $37,529
07 2.4231: Reduce the pressure of compressed air to the minimum required $23,599 $40 $21,827
139,028
kWh
$1,772
-
kW-mo/yr
- -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $23,521 $1,660 $20,082
127,913
kWh
$3,439
-
kW-mo/yr
- -
09 2.4321: Upgrade obsolete equipment $15,163 $4,691 $14,225
90,607
kWh
$938
-
kW-mo/yr
- -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $11,807 $22,446 $9,805
62,451
kWh
$2,002
-
kW-mo/yr
- -
11 2.7135: Install occupancy sensors $7,917 $1,281 $7,917
50,425
kWh
- - -
12 2.2515: Use optimum thickness insulation $6,276 $1,644 - - $6,276
-
MMBtu
-
13 2.7221: Lower temperature during the winter season and vice-versa $5,924 $40 $5,924
37,730
kWh
- - -
14 2.1233: Analyze flue gas for proper air/fuel ratio $5,797 $2,520 - - $5,797
-
MMBtu
-
15 2.4239: Eliminate or reduce compressed air usage $5,584 $5,100 $4,855
30,924
kWh
$729
-
kW-mo/yr
- -
16 2.7444: Close holes and openings in building such as broken windows $849 $29 $789
5,023
kWh
$60
-
kW-mo/yr
- -
TOTAL RECOMMENDED $530,595 $102,665 $433,906
2,763,736
kWh
$47,087
-
kW-mo/yr
$12,073
-
MMBtu
$37,529
TOTAL IMPLEMENTED $329,104 $40,715 $263,805
1,680,287
kWh
$21,973
-
kW-mo/yr
$5,797
-
MMBtu
$37,529
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs