ITAC Assessment: OK1145
ITAC logo
ITAC Assessment: OK1145
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Medical services
NAICS 622110: General Medical and Surgical Hospitals
SIC 8062: General Medical and Surgical Hospitals
Sales Range $5
M
to 10
M
# of Employees 45
Plant Area 93,000
ft2
Annual Production 1
units
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $243,933 2,869,798
kWh
Natural Gas $34,264 7,987
MMBtu
Waste Disposal Costs
Water Usage $103,347 9,544
Tgal
Water Disposal $33,170 2,994
Tgal
TOTAL YEARLY COSTS $414,714
RECOMMENDED SAVINGS* $105,148 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.9114: Use solar heat to make electricty $28,062 $192,816 $28,062
330,137
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $13,337 $51,312 $13,337
156,903
kWh
- -
03 2.7232: Replace existing hvac unit with high efficiency model $1,145 $2,640 $1,145
13,475
kWh
- -
04 2.7211: Clean and maintain refrigerant condensers and towers $9,757 $5,800 $9,757
114,794
kWh
- -
05 2.7261: Install timers and/or thermostats $1,197 $6,240 - $1,197
-
MMBtu
-
06 2.7226: Use computer programs to optimize hvac performance $22,401 $50,400 $22,401
263,543
kWh
- -
07 2.3212: Optimize plant power factor $2,170 $9,417 - - $2,170
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $17,287 $6,120 $17,287
203,378
kWh
- -
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $315 $1,080 $315
3,705
kWh
- -
10 2.6211: Conserve energy by efficient use of vending machines $959 $800 $959
11,283
kWh
- -
11 2.7491: Insulate glazing, walls, ceilings, and roofs $1,384 $16,085 $839
9,876
kWh
$545
-
MMBtu
-
12 2.2414: Use waste heat from hot flue gases to preheat $7,134 $13,000 - $7,134
-
MMBtu
-
TOTAL RECOMMENDED $105,148 $355,710 $94,102
1,107,094
kWh
$8,876
-
MMBtu
$2,170
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs