ITAC Assessment: WV0030
ITAC logo
ITAC Assessment: WV0030
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Cardboard and Cardboard Boxes
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 175,000
ft2
Annual Production 360,000
thousand feet
Production Hrs. Annual 8,736
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $126,760 2,597,011
kWh
Natural Gas $152,589 35,939
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,843 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,720

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,347 $1,920 $1,347
61,841
kWh
-
02 2.4133: Use most efficient type of electric motors $288 $15,380 $288
13,189
kWh
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $1,419 $500 - $1,419
-
MMBtu
04 2.1213: Direct warmest air to combustion intake $10,302 $1,500 - $10,302
-
MMBtu
05 2.2511: Insulate bare equipment $1,108 $46 - $1,108
-
MMBtu
06 2.1233: Analyze flue gas for proper air/fuel ratio $5,134 $300 - $5,134
-
MMBtu
07 2.2136: Install / repair insulation on steam lines $4,093 $510 - $4,093
-
MMBtu
08 2.4221: Install compressor air intakes in coolest locations $119 $220 $119
5,569
kWh
-
09 2.6218: Turn off equipment when not in use $1,067 $165 $1,067
48,945
kWh
-
10 2.4314: Use synthetic lubricant $479 - $479
21,981
kWh
-
11 2.4111: Utilize energy-efficient belts and other improved mechanisms $487 - $487
22,274
kWh
-
TOTAL RECOMMENDED $25,843 $20,541 $3,787
173,799
kWh
$22,056
-
MMBtu
TOTAL IMPLEMENTED $2,720 $17,520 $2,720
124,854
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs