| Assessment Year | 2024 |
|---|---|
| Principal Product | Wine |
| NAICS | 312130: Wineries |
| SIC | 2084: Wines, Brandy, and Brandy Spirits |
| Sales Range | $1 M to 5M |
| # of Employees | 7 |
| Plant Area |
17,700
ft2
|
| Annual Production | 40,000
pieces
|
| Production Hrs. Annual | 1,530
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $167,714 | 1,150,394 |
kWh
|
$0.15 |
| Electricity Demand | $26,515 | 1,251 |
kW-mo/yr
|
$21.20 |
| Electricity Fees | $2,326 | - |
|
- |
| LPG | $8,330 | 284 |
MMBtu
|
$29.34 |
| TOTAL YEARLY COSTS | $204,885 | |||
| RECOMMENDED SAVINGS* | $90,470 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $37,344 | $306,517 |
$31,536
216,295
kWh
|
$5,808
-
kW-mo/yr
|
- | |
| 02 | 2.7447: Install vinyl strip / high speed / air curtain doors | $25,325 | $20,000 |
$25,325
173,694
kWh
|
- | - | |
| 03 | 2.3112: Store heated/ cooled water for use during peak demand periods | $8,942 | $30,000 | - |
$8,942
-
kW-mo/yr
|
- | |
| 04 | 2.2622: Replace existing chiller with high efficiency model | $8,940 | $67,000 |
$8,940
61,320
kWh
|
- | - | |
| 05 | 2.8227: Adjust / maintain fork lift trucks for most efficient operation | $2,757 | $20,000 |
$(-3,009.0)
(-20,639)
kWh
|
$(-2,564.0)
-
kW-mo/yr
|
$8,330
-
MMBtu
|
|
| 06 | 2.3132: Recharge batteries on during off-peak demand periods | $2,563 | $100 | - |
$2,563
-
kW-mo/yr
|
- | |
| 07 | 2.7135: Install occupancy sensors | $2,443 | $1,800 |
$1,435
9,838
kWh
|
$1,008
-
kW-mo/yr
|
- | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,321 | $1,928 |
$776
5,321
kWh
|
$545
-
kW-mo/yr
|
- | |
| 09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $835 | $400 |
$574
3,937
kWh
|
$261
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $90,470 | $447,745 |
$65,577
449,766
kWh
|
$16,563
-
kW-mo/yr
|
$8,330
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs