| Assessment Year | 2022 |
|---|---|
| Principal Product | Automotive Circuit Boards |
| NAICS | 335931: Current-Carrying Wiring Device Manufacturing |
| SIC | 3643: Current-Carrying Wiring Devices |
| Sales Range | $100 M to 500M |
| # of Employees | 670 |
| Plant Area |
280,000
ft2
|
| Annual Production | 106,000,000
units
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $555,196 | 13,209,600 |
kWh
|
$0.042 |
| Electricity Demand | $661,009 | 24,874 |
kW-mo/yr
|
$26.57 |
| Natural Gas | $57,037 | 9,353 |
MMBtu
|
$6.10 |
| TOTAL YEARLY COSTS | $1,273,242 | |||
| RECOMMENDED SAVINGS* | $40,159 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $21,347 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $18,417 | $10,160 |
$7,874
196,842
kWh
|
$10,543
-
kW-mo/yr
|
- | |
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $18,200 | $7,825 |
$12,542
313,544
kWh
|
$5,659
-
kW-mo/yr
|
- | |
| 03 | 2.7111: Reduce illumination to minimum necessary levels | $1,914 | - |
$840
21,010
kWh
|
$1,074
-
kW-mo/yr
|
- | |
| 04 | 3.1191: Change procedures / equipment / operating conditions | $1,004 | - |
$61
1,528
kWh
|
- |
$943
-
MMBtu
|
|
| 05 | 2.6232: Install set-back timers | $612 | $541 |
$515
12,863
kWh
|
- |
$98
-
MMBtu
|
|
| 06 | 2.7444: Close holes and openings in building such as broken windows | $12 | $44 |
$2
46
kWh
|
- |
$10
-
MMBtu
|
|
| TOTAL RECOMMENDED | $40,159 | $18,571 |
$21,833
545,833
kWh
|
$17,275
-
kW-mo/yr
|
$1,051
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $21,347 | $10,204 |
$8,777
219,426
kWh
|
$11,616
-
kW-mo/yr
|
$953
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs