Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

562

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
GT0970 #06 Y:2023 Use solar heat to make electricty $70,120 $1,934,090
GT0970 #04 Y:2023 Utilize energy-efficient belts and other improved mechanisms $268 $456
CL2106 #04 Y:2021 Utilize daylight whenever possible in lieu of artificial light $40 $160
CL2106 #02 Y:2021 Install occupancy sensors $4,370 $5,425
CL2106 #01 Y:2021 Utilize higher efficiency lamps and/or ballasts $12,735 $6,460
CL2104 #04 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $3,440 $15,000
CL2104 #03 Y:2021 Insulate bare equipment $270 $250
CL2104 #02 Y:2021 Utilize higher efficiency lamps and/or ballasts $1,151 $5,640
CL2104 #01 Y:2021 Utilize higher efficiency lamps and/or ballasts $3,291 $14,832
CL2103 #06 Y:2021 Eliminate or reduce compressed air usage $9,015 -
CL2103 #04 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $3,873 $15,000
CL2103 #01 Y:2021 Utilize higher efficiency lamps and/or ballasts $8,209 $27,253
CL2017 #03 Y:2020 Change rate schedules or other changes in utility service $3,093 -
CL2016 #05 Y:2020 Reschedule plant operations or reduce load to avoid peaks $967 $400
CL2016 #04 Y:2020 Use adjustable frequency drive or multiple speed motors on existing system $19,257 $43,750
CL2015 #04 Y:2020 Eliminate leaks in inert gas and compressed air lines/ valves $2,229 $4,600
CL2015 #03 Y:2020 Keep doors and windows shut when not on use $53 -
CL2015 #02 Y:2020 Use optimum temperature $17,243 -
CL2015 #01 Y:2020 Modify startup/shutdown times $7,855 $550
NC0654 #05 Y:2020 Recover waste heat from equipment $44,735 $130,000