ITAC Assessment: CL2017
ITAC logo
ITAC Assessment: CL2017
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Various composite products
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 225
Plant Area 350,000
ft2
Annual Production 10,000,000
pieces
Production Hrs. Annual 2,600
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $114,651 1,026,220
kWh
Electricity Demand $769 1,083
kW-mo/yr
Electricity Fees $11,805 -
Natural Gas $4,289 414
MMBtu
Waste Disposal Costs
Water Usage $950 95
Tgal
Water Disposal $950 95
Tgal
TOTAL YEARLY COSTS $133,414
RECOMMENDED SAVINGS* $15,497 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,404

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7135: Install occupancy sensors $206 $230 $206
1,843
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,804 $2,100 $8,783
78,612
kWh
$21
-
kW-mo/yr
03 2.8114: Change rate schedules or other changes in utility service $3,093 - - $3,093
-
kW-mo/yr
04 2.7261: Install timers and/or thermostats $1,387 - $1,387
12,410
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,006 $789 $1,949
17,449
kWh
$57
-
kW-mo/yr
TOTAL RECOMMENDED $15,497 $3,119 $12,325
110,315
kWh
$3,172
-
kW-mo/yr
TOTAL IMPLEMENTED $12,404 $3,119 $12,325
110,315
kWh
$79
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs