ITAC Assessment: SF0634
ITAC logo
ITAC Assessment: SF0634
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Tempered Glass
NAICS 327211: Flat Glass Manufacturing
SIC 3211: Flat Glass
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 100,000
ft2
Annual Production 13,200,000
units
Production Hrs. Annual 6,240
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,189,189 7,881,360
kWh
Electricity Demand $1,452,723 25,898
kW-mo/yr
Natural Gas $1,097 45
MMBtu
TOTAL YEARLY COSTS $2,643,009
RECOMMENDED SAVINGS* $128,627 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Primary Raw Material Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,190 - $7,150
47,380
kWh
- - $(-960.0) -
02 2.6218: Turn off equipment when not in use $11,091 - $6,467
42,855
kWh
$4,624
-
kW-mo/yr
- - -
03 2.4239: Eliminate or reduce compressed air usage $25,314 $6,300 $25,314
167,753
kWh
- - - -
04 2.6231: Utilize controls to operate equipment only when needed $55,964 $17,866 $55,964
370,871
kWh
- - - -
05 2.3132: Recharge batteries on during off-peak demand periods $3,706 $2,070 - - $3,706 - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,362 $8,453 $5,458
36,172
kWh
$3,904
-
kW-mo/yr
- - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,856 $6,881 $6,856
45,492
kWh
- - - -
08 2.2447: Heat water with exhaust heat $9,559 $18,756 $5,588
37,032
kWh
$3,971
-
kW-mo/yr
- - -
09 2.7134: Use photocell controls $585 $1,248 $509
3,374
kWh
- - $24 $52
TOTAL RECOMMENDED $128,627 $61,574 $113,306
750,929
kWh
$12,499
-
kW-mo/yr
$3,706 $(-936.0) $52
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs