ITAC Assessment: UU0239
ITAC logo
ITAC Assessment: UU0239
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Cookies and crackers
NAICS 311821: Cookie and Cracker Manufacturing
SIC 2052: Cookies and Crackers
Sales Range $100
M
to 500
M
# of Employees 500
Plant Area 375,000
ft2
Annual Production 70,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $648,934 19,483,200
kWh
Electricity Demand $670,133 35,111
kW-mo/yr
Natural Gas $735,422 139,600
MMBtu
TOTAL YEARLY COSTS $2,054,489
RECOMMENDED SAVINGS* $61,472 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $55,411

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.8121: Apply for tax-free status for energy purchases $21,184 $8,000 - - $21,184 -
02 2.4224: Upgrade controls on compressors $18,178 $2,000 $10,183
305,700
kWh
$7,995
-
kW-mo/yr
- -
03 2.2691: Shut off cooling if cold outside air will cool process $9,905 $9,905 $5,549
166,573
kWh
$4,356
-
kW-mo/yr
- -
04 2.2511: Insulate bare equipment $6,144 $7,887 - - - $6,144
-
MMBtu
05 2.6212: Turn off equipment during breaks, reduce operating time $3,050 $1,400 - - - $3,050
-
MMBtu
06 2.4231: Reduce the pressure of compressed air to the minimum required $3,011 $3,011 $1,687
50,604
kWh
$1,324
-
kW-mo/yr
- -
TOTAL RECOMMENDED $61,472 $32,203 $17,419
522,877
kWh
$13,675
-
kW-mo/yr
$21,184 $9,194
-
MMBtu
TOTAL IMPLEMENTED $55,411 $27,792 $15,732
472,273
kWh
$12,351
-
kW-mo/yr
$21,184 $6,144
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs