ITAC Assessment: GT0970
ITAC logo
ITAC Assessment: GT0970
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Greige Fabric and FR Workwear
NAICS 313210: Broadwoven Fabric Mills
SIC 2211: Broadwoven Fabric Mills, Cotton
Sales Range $100
M
to 500
M
# of Employees 320
Plant Area 260,000
ft2
Annual Production 22,424,012
units
Production Hrs. Annual 6,240
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,823,409 53,000,726
kWh
Natural Gas $426,430 56,675
MMBtu
TOTAL YEARLY COSTS $3,249,839
RECOMMENDED SAVINGS* $212,386 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $141,998

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $37,757 $200 $37,757
712,401
kWh
-
02 2.7447: Install vinyl strip / high speed / air curtain doors $4,613 $75 $4,613
87,062
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,675 $1,850 $8,575
161,793
kWh
$(-2,900.0)
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $268 $456 $268
5,065
kWh
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $93,953 $385,000 $93,953
1,772,709
kWh
-
06 2.9114: Use solar heat to make electricty $70,120 $1,934,090 $70,120
1,316,279
kWh
-
TOTAL RECOMMENDED $212,386 $2,321,671 $215,286
4,055,309
kWh
$(-2,900.0)
TOTAL IMPLEMENTED $141,998 $387,125 $144,898
2,733,965
kWh
$(-2,900.0)