ITAC Assessment: TN0482
ITAC logo
ITAC Assessment: TN0482
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Industrial and airplane carburators
NAICS
n/a
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $5
M
to 10
M
# of Employees 106
Plant Area 90,000
ft2
Annual Production 70,000
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $117,180 1,859,906
kWh
Natural Gas $14,428 2,677
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,011 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7144: Install spectral reflectors / delamp $18,977 $30,900 n/a $18,977
272,274
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,459 $1,504 n/a $1,459
23,154
kWh
03 2.7111: Reduce illumination to minimum necessary levels $5,234 $600 n/a $5,234
76,495
kWh
04 2.4221: Install compressor air intakes in coolest locations $923 $185 n/a $923
14,654
kWh
05 2.6212: Turn off equipment during breaks, reduce operating time $277 $720 n/a $277
4,396
kWh
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $10,141 - n/a $10,141
-
kWh
TOTAL RECOMMENDED $37,011 $33,909 $37,011
390,973
kWh
TOTAL IMPLEMENTED - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs