Assessment Year | 1998 |
---|---|
Principal Product | Aerospace Models |
NAICS |
n/a
|
SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 70 |
Plant Area |
41,000
ft2
|
Annual Production | 20
pieces
|
Production Hrs. Annual | 6,760
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $35,857 | 701,641 |
kWh
|
$0.051 |
Electricity Demand | $13,090 | 2,328 |
kW-mo/yr
|
$5.62 |
Electricity Fees | $539 | - |
|
- |
Natural Gas | $2,978 | 404 |
MMBtu
|
$7.37 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $25,768 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,679 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,198 | $1,457 |
$2,224
42,790
kWh
|
$974
-
kW-mo/yr
|
- | - | |
02 | 2.7132: Install timers on light switches in little used areas | $143 | $80 |
$112
2,052
kWh
|
$31
-
kW-mo/yr
|
- | - | |
03 | 2.6214: Shut off pilots in standby equipment | $35 | $10 | - | - |
$35
-
MMBtu
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,303 | $509 |
$2,729
52,462
kWh
|
$574
-
kW-mo/yr
|
- | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,123 | $50 |
$516
9,965
kWh
|
$607
-
kW-mo/yr
|
- | - | |
06 | 2.2437: Recover waste heat from equipment | $538 | $1,010 | - | - |
$538
-
MMBtu
|
- | |
07 | 4.322: Eliminate old stock and modify inventory control | $17,428 | $9,180 | - | - | - | $17,428 | |
TOTAL RECOMMENDED | $25,768 | $12,296 |
$5,581
107,269
kWh
|
$2,186
-
kW-mo/yr
|
$573
-
MMBtu
|
$17,428 | ||
TOTAL IMPLEMENTED | $6,679 | $2,056 |
$5,065
97,304
kWh
|
$1,579
-
kW-mo/yr
|
$35
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs