ITAC Assessment: CL2104
ITAC logo
ITAC Assessment: CL2104
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Plastic Components (Auto)
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 208
Plant Area 40,089
ft2
Annual Production 25,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $577,757 16,463,482
kWh
Electricity Demand $438,620 36,993
kW-mo/yr
Electricity Fees $7,825 -
Waste Disposal Costs
Water Usage $11,467 228
Tgal
TOTAL YEARLY COSTS $1,035,669
RECOMMENDED SAVINGS* $30,894 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,742

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,291 $14,832 $2,080
52,009
kWh
$1,211
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,151 $5,640 $1,151
28,754
kWh
-
03 2.2511: Insulate bare equipment $270 $250 $270
7,678
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,440 $15,000 $3,440
98,001
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $22,742 $2,100 $22,742
614,752
kWh
-
TOTAL RECOMMENDED $30,894 $37,822 $29,683
801,194
kWh
$1,211
-
kW-mo/yr
TOTAL IMPLEMENTED $22,742 $2,100 $22,742
614,752
kWh
-