ITAC Assessment: CL2016
ITAC logo
ITAC Assessment: CL2016
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Automotive parts
NAICS 336310: Motor Vehicle Gasoline Engine and Engine Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 54
Plant Area 10,994
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 6,672
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $420,232 3,688,160
kWh
Electricity Demand $6,051 2,685
kW-mo/yr
Electricity Fees $7,875 -
Natural Gas $14,809 1,292
MMBtu
Waste Disposal Costs
Water Usage $4,692 709
Tgal
Water Disposal $7,308 709
Tgal
TOTAL YEARLY COSTS $460,967
RECOMMENDED SAVINGS* $44,446 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,222

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $11,588 $3,733 $11,190
98,212
kWh
$398
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $5,838 $656 $5,838
51,241
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,376 $1,720 $1,372
12,041
kWh
$4
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $19,257 $43,750 $18,275
160,391
kWh
$982
-
kW-mo/yr
-
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $967 $400 - $967
-
kW-mo/yr
-
06 2.7442: Keep doors and windows shut when not on use $797 - $797
6,998
kWh
- -
07 2.7221: Lower temperature during the winter season and vice-versa $567 - $567
4,979
kWh
- -
08 2.2437: Recover waste heat from equipment $4,055 $2,500 - - $4,055
-
MMBtu
TOTAL RECOMMENDED $44,446 $52,759 $38,040
333,861
kWh
$2,351
-
kW-mo/yr
$4,055
-
MMBtu
TOTAL IMPLEMENTED $24,222 $8,609 $19,765
173,470
kWh
$402
-
kW-mo/yr
$4,055
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs