ITAC Assessment: CL2106
ITAC logo
ITAC Assessment: CL2106
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Welding Contacts and Control Systems
NAICS 333992: Welding and Soldering Equipment Manufacturing
SIC 3548: Electric and Gas Welding and Soldering Equipment
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 70,000
ft2
Annual Production 100,000
units
Production Hrs. Annual 5,000
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $88,408 855,400
kWh
Electricity Demand $1 5,058
kW-mo/yr
Electricity Fees $3,452 -
Natural Gas $3,689 446
MMBtu
Waste Disposal Costs
Water Usage $1,116 228
Tgal
Water Disposal $1,736 228
Tgal
Solid Waste (non-haz) $244,039 150,000
lb
TOTAL YEARLY COSTS $342,441
RECOMMENDED SAVINGS* $20,501 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,356

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $12,735 $6,460 $12,735
122,450
kWh
02 2.7135: Install occupancy sensors $4,370 $5,425 $4,370
42,204
kWh
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,356 $2,100 $3,356
32,407
kWh
04 2.7121: Utilize daylight whenever possible in lieu of artificial light $40 $160 $40
384
kWh
TOTAL RECOMMENDED $20,501 $14,145 $20,501
197,445
kWh
TOTAL IMPLEMENTED $3,356 $2,100 $3,356
32,407
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs