Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

253

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MI0437 #04 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $28,425 $24,780
MI0437 #03 Y:2023 Change rate schedules or other changes in utility service $92,403 $2,400
MI0437 #01 Y:2023 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $595,572 $1,797,720
MI0431 #02 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $10,760 $11,272
MI0431 #01 Y:2023 Utilize a less expensive cooling method $11,840 $55,500
MI0427 #06 Y:2023 Eliminate or reduce compressed air usage $1,805 $2,630
MI0427 #05 Y:2023 Change rate schedules or other changes in utility service $1,869 $100
MI0427 #04 Y:2023 Install vinyl strip / high speed / air curtain doors $2,790 $4,860
MI0427 #02 Y:2023 Lower temperature during the winter season and vice-versa $14,947 $240
MI0419 #05 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $2,018 $4,860
MI0418 #03 Y:2023 Change rate schedules or other changes in utility service $1,322 $100
MI0418 #02 Y:2023 Optimize plant power factor $1,796 $1,143
MI0415 #06 Y:2022 Increase efficiency of trucks $15,778 $12,180
MI0415 #05 Y:2022 Change rate schedules or other changes in utility service $142,120 $2,400
MI0415 #04 Y:2022 Optimize plant power factor $4,830 $7,950
MI0415 #03 Y:2022 Replace boiler $73,846 $170,000
MI0415 #01 Y:2022 Install occupancy sensors $10,535 $3,084
MI0412 #05 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $40,422 $1,980
MI0412 #04 Y:2022 Replace electrically-operated equipment with fossil fuel equipment $2,603 $6,042
MI0412 #03 Y:2022 Do not use compressed air for personal cooling $9,634 $2,055