Assessment Year | 2023 |
---|---|
Principal Product | Metal Window and Door |
NAICS | 332321: Metal Window and Door Manufacturing |
SIC | 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing |
Sales Range | $50 M to 100M |
# of Employees | 135 |
Plant Area |
65,000
ft2
|
Annual Production | 127,550
pieces
|
Production Hrs. Annual | 3,276
hrs
|
Location (State) | Puerto Rico |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $229,342 | 1,005,840 |
kWh
|
$0.23 |
Electricity Demand | $53,138 | 5,710 |
kW-mo/yr
|
$9.31 |
Electricity Fees | $5,415 | - |
|
- |
TOTAL YEARLY COSTS | $287,895 | |||
RECOMMENDED SAVINGS* | $53,001 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $30,401 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2628: Utilize a less expensive cooling method | $11,840 | $55,500 |
$5,580
24,474
kWh
|
$760
-
kW-mo/yr
|
$5,500 | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $10,760 | $11,272 |
$9,364
41,071
kWh
|
$1,396
-
kW-mo/yr
|
- | |
03 | 2.3212: Optimize plant power factor | $8,963 | $16,003 | - |
$8,963
-
kW-mo/yr
|
- | |
04 | 2.7135: Install occupancy sensors | $8,323 | $680 |
$7,244
31,772
kWh
|
$1,079
-
kW-mo/yr
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,269 | $1,020 |
$3,785
16,600
kWh
|
$3,484
-
kW-mo/yr
|
- | |
06 | 2.4239: Eliminate or reduce compressed air usage | $5,030 | $80 |
$4,304
18,876
kWh
|
$726
-
kW-mo/yr
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $816 | $1,400 |
$710
3,112
kWh
|
$106
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $53,001 | $85,955 |
$30,987
135,905
kWh
|
$16,514
-
kW-mo/yr
|
$5,500 | ||
TOTAL IMPLEMENTED | $30,401 | $19,183 |
$16,043
70,360
kWh
|
$14,358
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs