ITAC Assessment: MI0431
ITAC logo
ITAC Assessment: MI0431
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Metal Window and Door
NAICS 332321: Metal Window and Door Manufacturing
SIC 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing
Sales Range $50
M
to 100
M
# of Employees 135
Plant Area 65,000
ft2
Annual Production 127,550
pieces
Production Hrs. Annual 3,276
hrs
Location (State) Puerto Rico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $229,342 1,005,840
kWh
Electricity Demand $53,138 5,710
kW-mo/yr
Electricity Fees $5,415 -
TOTAL YEARLY COSTS $287,895
RECOMMENDED SAVINGS* $53,001 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,401

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.2628: Utilize a less expensive cooling method $11,840 $55,500 $5,580
24,474
kWh
$760
-
kW-mo/yr
$5,500
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,760 $11,272 $9,364
41,071
kWh
$1,396
-
kW-mo/yr
-
03 2.3212: Optimize plant power factor $8,963 $16,003 - $8,963
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $8,323 $680 $7,244
31,772
kWh
$1,079
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,269 $1,020 $3,785
16,600
kWh
$3,484
-
kW-mo/yr
-
06 2.4239: Eliminate or reduce compressed air usage $5,030 $80 $4,304
18,876
kWh
$726
-
kW-mo/yr
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $816 $1,400 $710
3,112
kWh
$106
-
kW-mo/yr
-
TOTAL RECOMMENDED $53,001 $85,955 $30,987
135,905
kWh
$16,514
-
kW-mo/yr
$5,500
TOTAL IMPLEMENTED $30,401 $19,183 $16,043
70,360
kWh
$14,358
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs